Idukki Dam, Vagamon
About Idukki Dam
History
Early surveys
The idea of constructing a dam for power generation was first conceived in 1919 in a report submitted by Italian engineer Jacob to the Travancore government, which was rejected. As per history, Shri Chemban Karuvellayan Kolumban, the head of 'Oorali' race during 1922, showed the way to the Malankara Estate Superintendent W.J.John and his friend AC Thomas Edattu, who were on hunting trip to forests near the present Arch Dam. Upon hearing the legend of Kuravan and Kurathi Hills, Thomas impressed by the sight of water flow between the mountains; suggested the spot suitable for an Arch dam. In 1932, W.J.John submitted a report to the Government of Travancore on the possibility of constructing a dam at Idukki for Power Generation.In 1935, assembly member Shri.K.A.Narayana Pillai brought the Idukki project to the attention of Government of Travancore. Italian engineers Angelo Omedayo and Clantheyo Masele conducted a study in 1937 but things didn't go forward. In 1947, a preliminary investigation report was prepared and submitted by Sri. P. Joseph John, the then Chief Electrical Engineer to the Government of Travancore. It was during 1956 that the Central Water Commission conducted a detailed investigation based on the Government's request. The project report was prepared in 1961 and the Planning Commission accorded sanction for implementing the scheme in 1963. In 1964, under the leadership of Sri. E.U.Philipose, Superintending Engineer, preliminary works of the project were started.
Construction
The construction of this Dam commenced on 30 April 1969. The project lead by Dr.D.Babu Paul IAS, who appointed as Project Coordinator, Idukki Hydel Project & District Collector with several engineers like Sri. C.V Mathews(Retired Chief Engineer, Electricity Board) . The Government of Canada aided the Project with long term loans and grants. SNC-Lavalin, Canada, a well-known firm of Consulting Engineers were advising and assisting Project Engineers under Canadian aid, while Hindustan Construction Company (a.k.a. HCC) of Walchand group won the bid for construction.Storage of water in Idukki reservoir commenced in February, 1973. The inauguration of trial run of the first machine was celebrated on 4 October 1975. Commercial operation of the Power Station was Commissioned on 12 February 1976 by the then Hon. Prime Minister Smt. Indira Gandhi.